Sewer Job - This area had a existing 33 inch concrete pipe which was
installed in the 1940's
We added a 36 inch plastic pipe to increase the flow
The old and new pipes connected in an 8 ft x 12 ft manhole
We also put new ductile iron pipe across the creek as the existing bridge was to be replaced